How to Keep Service Penetrations Sealed in 2027

TL;DR
Most open holes in compartment walls and floors are made after a building is handed over, when contractors run new cables, pipes and data lines and nobody seals behind them.
Keeping penetrations sealed in 2027 comes down to four habits: control who opens a wall, agree who seals it before the work starts, check above the ceiling before you sign the job off, and keep a photo record of every seal.
Start the year with a baseline survey of risers and ceiling voids so you know what is already open.
Put the busiest areas (comms rooms, risers, plant rooms and tenant fit-out floors) on a regular check cycle, so new breaches are found within months of being made.
Close what you find with the right tested product for each service, and keep the evidence with your fire safety records.
If you look after a building where IT, telecoms, M&E and fit-out contractors are in and out every month, you have probably lifted a ceiling tile and found a neat new cable bundle running through a ragged hole in a blockwork wall. Keeping service penetrations sealed in 2027 is mostly about control and evidence: decide who may make a hole, make sealing it part of the job, check it before sign-off, and record it. The rest of this article turns that into a plan you can run all year.
Why do service penetrations keep getting left open?
Walls and floors that divide a building into fire compartments are only as good as the holes through them. Every time a cable, pipe or duct passes through, the gap around it has to be sealed with a tested fire stopping product, or smoke and fire can travel straight through above the ceiling where nobody sees it. The holes are rarely left open on purpose. A data installer adds two cables to an existing bundle, a plumber reroutes a pipe, a tenant's fit-out team moves a riser feed, and each assumes someone else will make good. Because the work happens out of sight, the gap can sit there until a survey or an incident finds it.
What should your 2027 plan for service penetrations include?
A plan that works for a busy estate usually has five parts:
A baseline. Know what is open now, floor by floor, before you try to keep it closed.
A permit step. No one breaches a compartment wall or floor without the facilities team knowing where and why.
Clear responsibility. The contractor making the hole either seals it with the right product or the job includes a competent firm to do it.
A check before sign-off. Someone lifts the tile and looks before the work is accepted.
A record. A photo, a location and a product reference for every seal, kept where an auditor or your fire risk assessor can find it.
Each part is simple on its own. The value comes from running all five every time, which is what stops breaches quietly building up through the year.
Start 2027 with a baseline survey
If you have not had your risers, ceiling voids and plant rooms looked at recently, start there. A fire compartmentation survey maps which walls and floors form compartments, finds the open penetrations, photographs them and gives each one a location reference. That gives you a numbered list to close and a starting point to measure against. Without it, every new hole you find raises the question of whether it was there last year, and you cannot show progress. Our article on what a fire compartmentation survey is and how often one should be done explains what to expect.
Control who opens your walls
Most breaches can be traced to a single job, so the easiest point to stop them is before the work starts. Add a simple question to your permit to work or contractor induction: will this job pass anything through a wall, floor or ceiling that forms part of a fire compartment? If the answer is yes, ask who will seal it, with what product, and when. Point contractors to your compartment drawings or survey so they know which walls matter, and tell them the job will not be signed off until the seal has been seen. Our article on who is responsible for fire stopping after contractors install new services covers how to set that expectation in contracts.
Check above the ceiling before you sign off
Sign-off is the last point where the contractor is still on the job and easy to call back. Before you accept a job that involved new cables, pipes or ductwork, lift the nearest ceiling tiles or open the riser door and look at where the services pass through. You are looking for everyday defects: open gaps around new cables, foam squirted into a hole, mineral wool stuffed in without a sealant, a collar missing from a plastic pipe, or old fire stopping disturbed when cables were pulled through. If anything is wrong, it goes back to the contractor while they are still on site. Our article on whether you can use expanding foam for fire stopping explains why a quick foam fill is so often the problem.
Put the busiest areas on a check cycle
Some parts of a building change far more often than others. Comms rooms, risers, plant rooms and floors where tenants fit out regularly collect new penetrations every year, while a stair core may not change for a decade. In 2027, put those busy areas on a planned check cycle, for example as part of your annual passive fire protection programme, so new breaches are found soon after they are made. Our article on how often fire stopping should be inspected in a commercial building helps you set a defensible interval.
Close what you find properly
When a survey or check finds an open penetration, close it with a product tested for that service and that wall or floor. A cable bundle, a plastic waste pipe, a copper pipe and a steel duct each need a different solution, and the seal has to match the fire resistance of the element it passes through. Ask the contractor to photograph each seal before and after, label it with its location reference and record the product used. That turns a list of defects into a list of closed actions. For specific cases, see our articles on fire stopping around electrical cable penetrations and fire stopping techniques for pipe penetrations.
Keep records an auditor will accept
By the end of 2027 you want to be able to answer three questions quickly: where are the penetrations in each compartment wall and floor, which were opened or sealed this year, and what proof do you have that each seal is right. A simple register with the location reference, date, contractor, product and before and after photos does that. Keep it with your fire risk assessment and other fire safety records, and update it each time a job touches a compartment. If you manage a higher-risk residential building, the same records support the golden thread of building information that the Building Safety Act 2022 requires.
What to do next: how Protest ES Ltd helps
Open penetrations above a ceiling are one of the most common findings in a fire safety audit, and one of the easiest to prevent once the right habits are in place. We don't simply identify compliance issues. We help clients close them:
Fire stopping surveys and remediation, with every seal photographed and referenced
Fire compartmentation surveys that map your compartments and give you a baseline for 2027
Passive fire protection programmes that put risers, comms rooms and plant rooms on a regular check cycle
Fire door remedials on the same visit, so the doors in each compartment are put right too
One visit, more disciplines. Most FMs use separate contractors for fire doors, fire stopping and electrical testing, each with its own access, programme and paperwork. Protest ES Ltd delivers electrical compliance, fire door work, passive fire protection, including fire stopping and fire compartmentation, on the same visit: one contractor, one programme, one set of records across every site.
If you want to start 2027 knowing which penetrations are open and with a plan to keep them sealed, get in touch with our team or visit Protest ES Ltd.
Further reading from Protest ES Ltd
Frequently asked questions
What is a service penetration?
It is any place where a service such as a cable, pipe, duct or trunking passes through a wall or floor. Where that wall or floor forms a fire compartment, the gap around the service must be sealed with a tested product so fire and smoke cannot pass through.
Who should seal a service penetration?
Whoever makes the hole is responsible for making it good, either with the right tested product or by bringing in a competent fire stopping contractor. Agree this before the work starts, so it is part of the job.
How often should service penetrations be checked?
Busy areas such as risers, comms rooms and plant rooms are worth checking at least annually, plus after any job that passes services through a compartment wall or floor. Quieter areas can follow your wider survey cycle, guided by your fire risk assessment.
Can you use expanding foam to seal around cables?
Only a foam that has been tested and certified for that type of penetration and wall or floor, installed as the manufacturer's tests describe. General purpose expanding foam is not a fire seal and is one of the most common defects found above ceilings.
What records should I keep for fire stopping?
Keep a register with a location reference for each seal, the date, the contractor, the product used and before and after photos. Keep it with your fire safety records and update it whenever a job touches a compartment wall or floor.
What happens if an open penetration is found in an audit?
It will normally be raised as an action to close. Record it, get it sealed with the right product, photograph the finished seal and add it to your register, so you can show the action was closed.












.png)