top of page

18th Edition Amendment 2 now live!



The Wiring Regulations (BS 7671) are continuously reviewed to make sure that all requirements are in line with the electrical demands of the present day industry standards.


In order to maintain technical continuity with the UK, these assessments may also take place when standards change at an international or European level.


After the inital 6 month transitional period, BS7671:2018 Amendment 2 is now operational and comes into power with immediate effect.


What does this mean?


Existing installations that have been installed in accordance with earlier editions of the tegulations may not fully conform with Amendment 2 requirements. However, this wouldn’t necessarily mean that they are unsafe for continued use or will need upgrading.


IMPORTANT TO NOTE - Any work carried out on an existing installation will need to meet the requirements of Amendment 2 after 27th September 2022.



If you require support with any of the above mentioned or wish to learn more about this new amendment, please feel free to reach out to a member of our team: 01604 696113 or enquiries@protestesltd.co.uk.

Hozzászólások


ReportSafe link
Promptus website link
Volt Logic website link
20 years (3).png

Since 2003 we have been delivering the highest quality in Electrical Inspection & Testing to clients nationwide.

Want to know more? Get in touch now!

bottom of page